How To Do Commercial Metal Framing
Set screws first at each end of the metal framing track and then every 3 ft.
How to do commercial metal framing. You do not need an engineer to design a two-story above-grade structure using the prescriptive method but some jurisdictions may require an engineers stamp. Make sure you leave it loose until the drywall goes up. Cut each flange of the track on both ends 1 inch 25 cm lengthwise.
Metal framing is faster to accomplish. The proper way to handle an inside corner when you use metal stud framing is sliding that first sheet into the inside corner and fastening the last stud adjacent to the drywall. Whereas for residential projects Home Check Plus usually uses wood stud framing.
If your new to commercial metal stud framing and drywall these are the materials that you want to know. In commercial construction we typically build our interior walls with metal studs. How To - Build a metal stud wall.
Fabricate metal headers by cutting the track 2 inches 5 cm longer than the rough opening width. A fast construction would mean you can save time which also translates to you saving money. This way you can place the top and bottom plates against the floor layout to make sure you have accurate cuts every time.
Reply Martin March 15 2018 at 1255 pm And i am getting started i did the. Plumbing electrical and other fix-tures and mechanicals within the framing cavities must be flush with or inside the plane of the framing. Be An Industry Leader.
Metal studs can be used in residential however most homes likely have a wood structure so it is best and easiest to stay consistent and continue with wood. A steel building from General Steel is a versatile solution for a commercial space. Bend the web down 90 degrees using sheet metal locking pliers.